Delamain 220kV Substation & Grid Connection
Home Description
SID Application Documentation
SID Application Documentation
01. Cover Letter 02. Notification Letters to Prescribed Bodies 03. Application Form & SID Status Determination 04. Landowner & Statutory Undertaker Letters 05. Site Notice 06. Newspaper Notices 07. Schedule of SID Application Documentation 08. Site Location Mapping 09. Site Layout Plans & Other Application Drawings 10. Planning & Environmental Report 11. EIA Screening Report 12. Construction Methodology 13. Ecological Impact Assessment & AA Screening 14. Archaeological Impact Assessment 15. Site Access Report 16. Landscape & Visual Impact Assessment 17. Photomontages 18. Noise Impact Assessment 19. EMF & EMC Assessment (for info) 20. Decom & Restoration Mgt Plan (for info) 21. CEMP (for info) 22. Flood Risk Assessment
Spatial Data

This website has been designed to provide information on the Strategic Infrastructure Development (SID) application for the proposed Delamain 220kV substation and grid connection.

Following consultations under Section 182E of the Planning & Development Act 2000 (as amended), An Bord Pleanála determined that the development is SID which necessitates a planning application being made directly to the Board. It is a requirement of the Board that the applicant, in this case Delamain Solar Farm Limited, creates a website to include application documentation. This website will be updated as necessary over the duration of the application.

Built with planningapplication.ie © 2025


Home Description
SID Application Documentation
SID Application Documentation 01. Cover Letter 02. Notification Letters to Prescribed Bodies 03. Application Form & SID Status Determination 04. Landowner & Statutory Undertaker Letters 05. Site Notice 06. Newspaper Notices 07. Schedule of SID Application Documentation 08. Site Location Mapping 09. Site Layout Plans & Other Application Drawings 10. Planning & Environmental Report 11. EIA Screening Report 12. Construction Methodology 13. Ecological Impact Assessment & AA Screening 14. Archaeological Impact Assessment 15. Site Access Report 16. Landscape & Visual Impact Assessment 17. Photomontages 18. Noise Impact Assessment 19. EMF & EMC Assessment (for info) 20. Decom & Restoration Mgt Plan (for info) 21. CEMP (for info) 22. Flood Risk Assessment
Spatial Data